Projects

Trace Heating Projects

Caustic Storage Tank

Client: Diageo | Application: Process Temperature Maintenance

Requirement

Maintain caustic storage temperature to ensure product stability and safe handling in a process environment.

Key Constraints
• Installation within a caustic bund requiring enhanced PPE
• Scaffold access required and coordinated to avoid clashes with installation works
• Adjacent to ATEX / EX-rated areas

Electrace Solution
Complete strip-out of the existing trace heating system followed by a full heat-loss-based redesign. Environmental exposure, insulation specification, and required maintain temperature were assessed to deliver a stable, energy-efficient temperature maintenance system.

Outcome
A fully commissioned and documented system delivering consistent caustic storage temperatures, installed safely within a high-risk process environment and handed over for long-term operation.

IMG_1632___serialized2
IMG_1630___serialized2
IMG_1630___serialized1
IMG_1630
IMG_1628
IMG_1856
IMG_1861
IMG_1743
IMG_1855

Glucose Tank

Client: Lees (Finsbury) | Application: Process Temperature Maintenance

Requirement

Maintain glucose storage temperature within a defined operating range to ensure consistent viscosity, reliable transfer, and uninterrupted production. Temperature drop within the storage vessel would increase product viscosity, leading to pumping issues, reduced flow rates, and potential process downtime

Key Constraints

• Existing tank found to contain legacy trace heating during insulation removal
• Replacement tank differed in orientation, surface area, and thermal characteristics
• External installation at a food-safe manufacturing facility
• System design required to operate within the client’s existing electrical infrastructure, including breaker quantity and maximum breaker ratings

Electrace Solution

A full heat-loss calculation was carried out based on the new tank geometry, insulation type and thickness, external environmental conditions, and required maintain temperature. Heating cable selection and layout were engineered to deliver the required total heat output while remaining within electrical distribution limits.

Outcome

A compliant, food-safe temperature maintenance system delivering stable glucose viscosity and reliable process operation, achieved without modification to the existing electrical supply and supported by full commissioning and documentation.

IMG_2915
IMG_2914
IMG_2917
IMG_2913
IMG_2912
IMG_2918
IMG_2921
IMG_2920
IMG_2919
IMG_3234
IMG_3236
IMG_3219

Perth High School - ASHP LTHW & CHW 

Client: FES | Application: Building services frost protection

Requirement

Provide frost protection to ASHP low-temperature hot water (LTHW) and chilled water (CHW) pipework to prevent freezing, maintain system integrity, and ensure reliable operation within a live educational environment

Key Constraints

• Architect/consultant-designed specification with named manufacturer requirements
• Pipework routed internally and externally, requiring accurate temperature probe positioning
• Access constraints, including work at height above AHU equipment
• Multiple services requiring coordinated installation and control strategy

Electrace Solution

Full pipework layout design and drawing overmarking in line with the consultant specification. Heating cable routing, control zoning, and temperature sensor locations were engineered to suit mixed internal/external exposure. Installation was supported by a structured testing and commissioning programme, including staged electrical testing, client demonstration, and thermal imaging verification.

Outcome

A fully commissioned frost protection system delivering verified freeze protection across LTHW and CHW services, with documented testing and thermal imaging records supporting ongoing operation and maintenance.